The above-ground installation of pipeline systems in mining operations requires a solution that is fast, durable, and resilient. Primus Line® Overland Piping is specifically designed for extreme environments, combining high flexibility with maximum safety.
Thanks to its three-layer structure made of thermoplastic polyurethane (TPU) and aramid-reinforced composite material, the system is particularly resistant to UV radiation, abrasion, chemical exposure, and high loads. Additionally, the minimized number of connection points ensures lower leakage risk and greater structural integrity.
A major advantage is its quick and easy installation with minimal manpower requirements, a crucial factor in remote mining locations with limited access. According to Heiko Manzke, Director Australia and New Zealand, Primus Line® Overland Piping guarantees a reliable transport of water and process media, even in the most demanding environments.
With this innovative technology, Rädlinger primus line GmbH provides an efficient and sustainable solution that reduces operational costs and significantly enhances pipeline safety.